3597_Leskovac_IMG20220705130308

EMO supplied and successfully achieved the indoor installation of two lines for mechanical thickening of excess sludge and transport of thickened sludge, one operating and one standby unit, operating every 3 weeks, consisting of two gravity belt thickeners, two horizontal frame integrated flocculators, one automatic polymer preparation plant and two local control panels for GBT full supervision.

EMO polymer preparation plant

Les commentaires sont clos.